[an error occurred while processing this directive]
Physics 104 Set Up Instructions:
RC Circuits
Lab Directions
BlackBoard Notes


Basic Idea:

Number of setups: [an error occurred while processing this directive] Equipment Needed (each setup):

What: How Many: Where:
RC boards 1 non-Majors storeroom, shelf P2
9 volt battery 1 non-Majors storeroom, shelf L3
Wire 2 103 Lab
Digital multimeter 1 Majors storeroom, shelf A3

Computers Needed?

Notes:
  • Return To Setup Instructions [an error occurred while processing this directive]
    Revised: 19 Aug 19 Canton, NY 13617